Overview Search Up
Category: Technical Meeting Papers
folderTechnical Meeting Papers Subcategories: 0 Files: 661

Technical Meeting Papers

Technical Meetings are held three times per year.  Papers are available here for download.  You must be logged in to be able to download content.

 
Only registered and logged in users can download files from this category.
Downloads: 661
pdf0 1951 - June - Daley - Maintenance Features of Power Signalling Installation



Size 1.04 MB
pdf1 2015 - March - Heibel - CBTC for Mixed Traffic

Frank Heibel PhD MSc (Hon) MIEAust CPEng FIRSE

Doc Frank Training and Consulting

The mixed operation of different railways with diverging operational characteristics has

...

Size 387.29 KB
pdf2 1994 - Aug - Haley - Wollingford Lifting Bridge

David Haley MIRSE

Signals & Operational Systems Corporate Services Engineering Division Queensland Rail

In Queensland, private railways operated for cane haulage by sugar

...

Size 595.19 KB
pdf3 2010 - Oct - Nick Thompson - Implemenation of a metro signalling system



Size 3.96 MB
pdf4 2015 - October - Moore - Signalling Principles of ARTC HOT

Trevor Moore  BEng, MBA, FIRSE, FIE Aust 

Australian Rail Track Corporation

The Australian Rail Track Corporation was established in 1998 to manage the below rail assets from

...

Size 592.34 KB
pdf5 1980 - July - Preston Hennessy - The GEC-Reed Joint Track Circuit West



Size 1.29 MB
pdf6 1977 - July - Detering - CTC Power Signalling Rockhampton - Gladstone - Circuit Design



Size 1.4 MB
pdf7 1979 - March - Paramsothi - Entrance - Exit Panel Interface Possible Ap



Size 1 MB
pdf8 1948 - May - Stewart - Power Railway Signalling

Some Observations on English and American Practice

Mr. F. Stewart (Member) A. S. T. C., A. M.I.E. (Aust.) Assoc. Inst. T.,

Signal Engineer, McKenzie & Holland (Aust.)

...

Size 1.07 MB
pdf9 1995 - July - Davis - Open Discussion - Trusted Suppliers

Ken Davis

Recent cl.ianges to customer focussed orgaliisational structures has resulted in engineering, including railway signal and telecommuriications engineering, as being regarded

...

Size 34.48 KB
pdf10 1980 - Nov - Thomson - Application of Computers with Time Division Multipl



Size 1.43 MB
pdf11 1991 - Nov - Waller - Presidential Address - A Time of Change

J. Waller

International President of IRSE

J Waller's Presidential Address to the Australian secion of the IRSE, to be read in Brisbane on Saturday 30th 1991.



Size 488.26 KB
pdf12 1989 - July - Moore - Communications for Signalling Systems

T. G. Moore, P. Eng.,M.I.R.S.E.

Development Engineer, Signals Standards CityRail Engineering, State Rail Authority of NSW

Ever since signalling safeworking advanced beyond the

...

Size 234.76 KB
pdf13 1982 - March - Sheldon - Communications Aspects of Metrol

R Sheldon SMIREE

Communication Section, VicRail

The Melbourne Metropolitan Train Control Centre (METROL) has been established to co-ordinate all signalling and communications

...

Size 2.62 MB
pdf14 1966 - Oct - Moore - Modern Developments in Semiconductor Rectifiers

JR Moore BSc, BE, AMIE Aust AMIEE

Resident Engineer (NSW) McKenzie & Holland (Australia)

The latest review published in the Proceedings of the Institution of Electrical

...

Size 1.8 MB
pdf15 1969 - March - no author - Power Signalling Construction Practices - WAGR



Size 511.28 KB
pdf16 1967 - Feb - McCauley - Level Crossing Protection in Victoria

DE McCauley MIRSE

In this paper I intend to outline very briefly the history of Level Crossing Protection in Victoria and to describe some of the control problems and principal

...

Size 1.29 MB
pdf17 1967 - April - Summary of Level Crossing Protection Discussion

Summary of Level Crossing Protection discussion held at the 19th Annual General Meeting of the Australian Section of the IRSE.  Brisbane, April 1967.



Size 662.06 KB
pdf18 1978 - March - Cox - Melbourne - City of Level Crossings - Human Factors



Size 779.63 KB
pdf19 2002 - Nov - 5 Strachan - New Trains for Melbourne



Size 805.62 KB